Camp Washington Phase 1A
Camp Washington Phase 1A
Crosley Building History
Built in 1929 by Samuel Hannaford & Sons, the approximately 330,000 square-foot, nine-story building is an iconic local structure and part of the National Register of Historic Places. Originally home to the manufacturing operations of Powel Crosley radios, the building evolved over the years to be used for the creation of refrigerators, washing machines, and stoves. The Crosley facility closed in 1960 and subsequently became a warehouse for storage, office space, light manufacturing, and printing. In 2009, the building was abandoned entirely, and in 2012, was condemned by the City of Cincinnati, having fallen into significant disrepair.
Project Overview
The nearly 2-acre brownfield site is a staple in the community and symbolizes the long history of manufacturing and industrial activity in Cincinnati’s Camp Washington neighborhood. Now owned by The Port, the Crosley Building anchors a broader vision for the surrounding corridor: a district that pairs modern manufacturing and business-supporting space with the creative energy that already has roots in Camp Washington.
Rather than redevelop the building in isolation, The Port’s plan reactivates Crosley alongside adjacent parcels, bringing a high-potential but long-underused stretch of the neighborhood back into efficient use and contributing directly and indirectly to the region’s economic growth.
Funding Partners
- Ohio Department of Development
- City of Cincinnati
- Hamilton County
- Federal Community Project Funding
- General Electric Company
Development Status of Phase 1A
Since acquiring the properties, we’ve been working towards demo, remediation and site readiness, and now we can start looking forward to the future.
To date, the Crosley Building has been the beneficiary of a $2.4 million grant from the State of Ohio Brownfield Remediation Program. Environmental work has included abating asbestos, removing lead paint, and pursuing a Covenant Not to Sue with the Ohio EPA.
In December 2023, the City of Cincinnati and Hamilton County awarded The Port $2.6 million toward acquisition and due diligence. The Port has since acquired the building and continues stabilization work, including structural repairs to the concrete and roof.
The Port has advanced from acquisition into planning: the site is now a catalyst for the neighborhood revitalization in Camp Washington, with reuse of the Crosley Building and activation of adjacent parcels guided by structural analysis, architectural review and community input.
UPDATE: NOVEMBER 2026 – In November 2026, Ohio Governor Mike DeWine and Ohio Department of Development Director Lydia Mihalik announced statewide grant awards as part of the Ohio Brownfield Remediation Program, including grants for cleanup and remediation work on two properties in Camp Washington to prepare them for future development.
Creating the District
In collaboration with MSA Design, The Port has identified a vision for Phase 1A including opportunities around the Crosley Building, bounded by Arlington Street, Spring Grove Avenue, Monmouth Avenue, and Colerain Avenue. Conceptual renderings envision the district featuring outdoor seating and lush landscaping.
One of the first probable sites for redevelopment is the empty lot behind the American Sign Museum, which could become a modern makers’ space for the neighborhood’s already-thriving arts community. The building could be divided into flexible spaces of varying sizes, giving artists and manufacturers at different stages of their businesses room to grow and eventually, to graduate into larger spaces or into the redeveloped Crosley Building itself.
Potential tenants could range from neon and sign fabricators to furniture makers, distilleries, and coffee roasters, to businesses working in robotics, film, and TV production.
Impact:
Remediation, stabilization, and revitalization of multiple vacant and underutilized properties, including the historic Crosley Building.
Project Specs:
- Location: Camp Washington
- Type: Historic adaptive reuse and brownfield redevelopment
- Status: Remediation, stabilization, and planning underway